Institute for Disproportionate EngineeringEstablished 2026 ✦ In perpetuity, provisionally

BD–P001 Founding edition · 2026

The Principles

Six articles for the responsible practice of unreasonable engineering.

These articles distinguish a doctrinal intervention from a project that has merely become complicated. Compliance is a matter of substance. The use of Roman numerals is helpful but insufficient.

I. The solution must work

An intervention shall resolve the problem it claims to address. It must do so reliably, and without substituting a larger unresolved problem for the original inconvenience.

Excess is a matter of scope. It is never an exemption from competence. A custom command-line utility that requires more memorization than the commands it replaces is not automatically disqualified, but the committee will have questions.

Test of compliance: the original task can be completed, and the practitioner can demonstrate how.

II. The effort need not be justified

Technical merit and practical necessity are independent variables. A solution may be excellent even when the sensible course of action would have been to finish the task by hand.

The practitioner is not required to establish a commercial rationale. They are required to refrain from inventing one. Curiosity, satisfaction and a preference for beautifully resolved details are acceptable declarations of intent.

Test of compliance: ‘because I wanted to’ can be stated without a supplementary spreadsheet.

III. The small problem deserves respect

The triviality of an inconvenience does not invalidate its existence. Two seconds is a measurable duration. Three commands is a non-zero quantity of commands.

The practitioner shall describe the original problem accurately, without inflating its severity to make the intervention appear proportionate. The smaller the problem, the more important the precision of this record becomes.

Test of compliance: the problem statement is recognizable to a reasonable person, who remains unconvinced by the proposed response.

IV. Each part must have a reason

Every component shall serve an identifiable purpose within the chosen design. Redundancy may provide resilience. A queue may decouple operations. A schema may prevent the grocery list from admitting malformed bananas.

The doctrine permits a system whose total scale is indefensible. It does not excuse individual decisions that cannot be explained. Ornament disguised as architecture is still ornament, and should be labelled accordingly.

Test of compliance: the design review succeeds. The budget review does not.

V. The costs must remain visible

Time spent, dependencies introduced and maintenance accepted shall be recorded honestly. A future saving is a hypothesis until it has occurred. A dependency is a commitment even if it was easy to install.

Practitioners shall not transfer these obligations to others without their informed agreement. The right to overengineer one’s afternoon does not extend to a colleague’s weekend.

Test of compliance: the person maintaining the system knew what they were agreeing to, including the part about the system.

VI. The work must be allowed to end

An intervention shall admit a state in which it is complete. It should also admit a state in which it is removed.

Further refinements may be undertaken as separate acts of disproportionate engineering. They must not be presented as evidence that the previous act was never finished. The institute maintains an archive precisely because work should occasionally leave the workbench.

Test of compliance: there is a documented way to stop. Its implementation need not involve another service.


Interpretive note. These articles are to be read together. No single article authorizes a project. Equally, no sensible objection should be mistaken for a technical defect.